Record LNG bunkering platform presented by Panfido in Ravenna
26 October 2021

PRESS RELEASE

Record LNG bunkering platform presented by Panfido in Ravenna

The tugboat company Rimorchiatori Riuniti Panfido (Calderan group) in joint cooperation with the North Adriatic Sea Port Authority (ports of Venice & Chioggia) officially presented in Ravenna, the final stage of construction of the first ever built Semi Ballastable Barge Transporter (SBBT) that is the most tangible outcome of the Poseidon MED II project, co-financed by the Connecting Europe Facility Programme (CEF).

The innovative SBBT vessel with a load capacity of 4,000 m3 of LNG and 1,000 m3 of MDO (Marine Diesel Oil) will operate mainly in the North-Adriatic Sea, being the first vessel of this type in the Mediterranean region.

The new bunkering platform will operate in conjunction with a big tug that will find room directly inside the prow of the platform and will be incorporated in the keel thus creating a single unique marine system.

This system will boast of very high flexibility levels: in fact, it will take LNG provisions from a coastal storage center and it will be able to fuel LNG vessels booth moored at the quay and offshore, by granting top safety standards.

The new platform together with the tug are under the final stage of construction in the Rosetti Marino shipyard in Ravenna and are part of the Poseidon Med II project co-financed by the European Commission DG Move under the Connecting Europe Facility Programme (CEF).

The platform named Cargo Unit will also be able to provide big cruise vessels with LNG bunker thanks to the two large LNG tankers that are able to carry under controlled temperature a total volume of 4.000 cube metres of LNG plus 1000 cube metres of diesel oil.

The SBBT (Semi Ballastable Barge Transporter) system was conceived through a collaboration between Rimorchiatori Riuniti Panfido of Venice and the North Adriatic Sea Port Authority.

The Cargo Uniti is 109 metres long and 26,7 metres wide, with a draft between 3.7 and 6 metres. The total cost of the project will reach 40 million Euro, including the 9.5 million Euros of the EU financial aid.

“For the Company Panfido – Mr Davide Calderan, Rimorchiatori Riuniti Panfido’s CEO, stated – the commitment in the development of blue bunkering is not just a new business, but also a will for future sustainability”.

“Our shipyard – the CEO of Rosetti Marino, Mr. Oscar Guerra replayed- is facing a real innovation challenge and not by chance in a city, Ravenna, that boast a long and established tradition in the energy field”.

“We are moving forward – Stressed the President of the North Adriatic Sea port Authority – the energy transition of our port system with the creation of a north Adriatic bunkering system for LNG vessels”.

The Representatives of the European Commission, Mr. Jalali, Advisor to the European Coordinator for the Motorways of the Sea, and Ms. Chrysostomou, CINEA – PMEDII project officer, also participated to the event underlining that this represents one of the main results in the East Mediterranean Region for a CEF programme contributing to the EU sustainable development targets for the maritime transport sector by 2030.

The sole responsibility of this publication lies with the author. The European Union is not responsible for any use that may be made of the information contained therein.

What is Poseidon Med II project?

Poseidon Med II project is a practical roadmap which aims to bring about the wide adoption of LNG as a safe, environmentally efficient and viable alternative fuel for shipping and help the East Mediterranean marine transportation propel towards a low-carbon future. The project, which is co-funded by the European Union, involves three countries Greece, Italy and Cyprus, six European ports (Piraeus, Patras, Lemesos, Venice, Heraklion, Igoumenitsa) as well as the Revithoussa LNG terminal. The project brings together top experts from the marine, energy and financial sectors to design an integrated LNG value chain and establish a well-functioning and sustainable LNG market.

 

For Media enquiries please contact:

Hellenic Lloyd’s S.A.                                                       

Nagia Mentzi                                                                    

Regional Marketing Leader, Marine & Offshore, South Europe    

Email: [email protected]                                       

Tel: +30 210 9907802                     

 

Follow Poseidon Med II on

Twitter: @Poseidon_Med

Linkedin: https://www.linkedin.com/company-beta/17979123/

Facebook: @PoseidonMedII

sailling on the LNG era

The sole responsibility for the content of this webpage lies with the authors. It does not represent the opinion of the European Communities. The European Commission is not responsible for any use that may be made of the information contained therein.

Website Privacy Policy